欧美韩国日本桃色,一区二区三区国产私人毛片,精品极品精品,亚洲一区人妻,久久久久久久久亚洲免费,青娱乐91,亚洲情涩,久久久成人毛片,日本欧美不卡二区在线

中國自動化學(xué)會專家咨詢工作委員會指定宣傳媒體
新聞詳情

ABB通過集成DSX Blueprint AI基礎(chǔ)設(shè)施,擴(kuò)大與英偉達(dá)的合作

http://www.henanjusheng.com 2026-06-02 15:58 《中華工控網(wǎng)》翻譯

ABB Expands Collaboration With NVIDIA Through Integration of DSX Blueprint for AI Infrastructure
ABB通過集成DSX Blueprint AI基礎(chǔ)設(shè)施,擴(kuò)大與英偉達(dá)的合作

· ABB brings SimReady 3D digital assets – MV switchgear, electrical distribution equipment, and UPS platforms – into NVIDIA Omniverse DSX Blueprint
· Engineers validate electrical, thermal, and compute systems in digital twins before ordering prefabricated modules, compressing design cycles for AI factories
· Builds on October 2025 collaboration to develop 800 VDC power architecture for next-gen AI data centers

· ABB將SimReady 3D數(shù)字資產(chǎn)——中壓開關(guān)設(shè)備、配電設(shè)備和不間斷電源平臺——引入英偉達(dá)Omniverse DSX Blueprint
· 工程師在訂購預(yù)制模塊之前,通過數(shù)字孿生對電氣、熱管理和計算系統(tǒng)進(jìn)行驗(yàn)證,從而大幅縮短人工智能工廠的設(shè)計周期。
· 基于2025年10月的合作,共同開發(fā)面向下一代人工智能數(shù)據(jù)中心的800 VDC電源架構(gòu)

Zurich, Switzerland, June 01, 2026 -- ABB today announced the next phase of its collaboration with NVIDIA to accelerate AI infrastructure deployment. ABB will integrate its power systems as SimReady 3D digital assets into NVIDIA Omniverse DSX Blueprint – enabling data center operators to model, validate, and optimize source-to-rack power distribution before breaking ground.

瑞士蘇黎世,2026年6月1日 —— ABB今日宣布與英偉達(dá)開展合作的下一階段,以加速人工智能基礎(chǔ)設(shè)施的部署。ABB將把其電力系統(tǒng)作為SimReady 3D數(shù)字資產(chǎn)集成到英偉達(dá)Omniverse DSX Blueprint中,使數(shù)據(jù)中心運(yùn)營商能夠在動工前對從電源到機(jī)架的配電進(jìn)行建模、驗(yàn)證和優(yōu)化。

ABB's SimReady digital twins – physically accurate 3D representations of medium-voltage switchgear, electrical distribution equipment, and UPS platforms – are purpose-built for DSX co-design workflows.

ABB的SimReady數(shù)字孿生——即對中壓開關(guān)設(shè)備、電氣配電設(shè)備和不間斷電源平臺進(jìn)行物理精確的三維建模——專為DSX協(xié)同設(shè)計工作流而打造。

Once launched, this integration will allow engineers to model source-to-rack power distribution, protection schemes, and energy efficiency at campus scale within a unified digital environment. Allowing the validation of electrical, thermal, and compute systems together before construction begins, while facilitating the order of prefabricated ready-to-install modules.

該集成方案一經(jīng)部署,將使工程師能夠在統(tǒng)一的數(shù)字化環(huán)境中,對園區(qū)級的從電源到機(jī)架的配電系統(tǒng)、保護(hù)方案以及能源效率進(jìn)行建模。這不僅可在施工啟動前同步驗(yàn)證電氣、熱管理和計算系統(tǒng),還能有效推動預(yù)制化、即裝即用模塊的有序交付與安裝。

"Through this collaboration, ABB provides the electrification technology leadership that AI demands," said Jorge Lis, Global Data Center Segment Leader, ABB Electrification. "Time-to-first-token drives infrastructure decisions: DSX integration gives our customers a proven path from design to deployment, backed by ABB's global manufacturing reach and local engineering expertise. We deliver the electrical backbone these facilities need to scale at speed."

“通過此次合作,ABB為人工智能所需的關(guān)鍵電氣化技術(shù)提供了領(lǐng)先優(yōu)勢,”ABB電氣化業(yè)務(wù)全球數(shù)據(jù)中心部門負(fù)責(zé)人Jorge Lis表示,“從設(shè)計到部署的全流程效率直接決定了基礎(chǔ)設(shè)施的選型與落地:DSX集成方案為客戶打造了一條經(jīng)過驗(yàn)證的端到端路徑,并依托ABB遍布全球的制造網(wǎng)絡(luò)與本地化的工程實(shí)力提供有力支撐。我們?yōu)檫@些設(shè)施的快速規(guī)模化發(fā)展提供了不可或缺的電力基礎(chǔ)設(shè)施。”

Building on the October 2025 collaboration to support 800 VDC architecture announced by NVIDIA, the expanded collaboration aligns ABB's current portfolio and future planned assets with NVIDIA DSX and Omniverse libraries, where physical equipment performance can be tested against AI workload profiles that exceed one megawatt per rack. At the leading edge of AI infrastructure, compute racks will demand medium-voltage distribution, DC power, solid-state protection, and liquid cooling integrated from day one.

基于英偉達(dá)于2025年10月宣布的、旨在支持800 VDC架構(gòu)的合作,此次擴(kuò)展后的合作將ABB現(xiàn)有的產(chǎn)品組合及未來規(guī)劃中的相關(guān)資產(chǎn)與英偉達(dá)的DSX和Omniverse庫相銜接,從而能夠在每機(jī)架功率超過1兆瓦的AI工作負(fù)載場景下對物理設(shè)備性能進(jìn)行測試。在人工智能基礎(chǔ)設(shè)施的最前沿,計算機(jī)架從一開始就將需要集成中壓配電、直流供電、固態(tài)保護(hù)以及液冷技術(shù)。

With DSX integration, AI infrastructure developers will gain a proven path from digital design to physical deployment – backed by ABB's global manufacturing reach and local engineering expertise. ABB's MV-UPS and DC power platforms, combined with DSX co-design, will give data center operators the architecture to scale AI facilities with speed, consistency, and repeatability.

借助DSX集成,人工智能基礎(chǔ)設(shè)施開發(fā)者將獲得一條從數(shù)字化設(shè)計到物理部署的成熟路徑——這一方案由ABB遍布全球的制造網(wǎng)絡(luò)與本地工程專長提供有力支撐。ABB的中壓不間斷電源(MV-UPS)與直流供電平臺,配合DSX協(xié)同設(shè)計,將為數(shù)據(jù)中心運(yùn)營商打造一套能夠以高速度、高一致性與高可重復(fù)性擴(kuò)展AI設(shè)施的架構(gòu)。

版權(quán)所有 工控網(wǎng) Copyright?2026 Gkong.com, All Rights Reserved
沾益县| 灵璧县| 淮安市| 乌拉特中旗| 织金县| 隆子县| 措勤县| 泊头市| 双柏县| 开阳县| 酒泉市| 子洲县| 大连市| 洛扎县| 石家庄市| 扎兰屯市| 全椒县| 凌源市| 湖南省| 平原县| 邵武市| 许昌市| 鸡东县| 都兰县| 抚州市| 博客| 贞丰县| 资阳市| 尉犁县| 右玉县| 阿坝| 昂仁县| 万州区| 阳江市| 莱西市| 普宁市| 常宁市| 剑川县| 榕江县| 贵阳市| 桐庐县|